Monday, April 19, 2010

So Over Moving

Last week we moved to our final rental.  Although it is a comfortable place and will work nicely for us, I just can't wait to get back into the house.  I'm done.  Stan, being the easy going one, takes this in stride - I do not.  Two months will seem like nothing when it is over but right now it's dragging on forever.

My recollections of last week pretty much cover the bad and the ugly (moving AGAIN) and not the good.  The electrician and A.V. guy began work, the gardeners tore out more of the jungle, etc.  Beyond that is a blur.

Today I picked all the interior colors, more than two, so we're over budget again.  Greens, grayish greens, one eggplant/purple wall in the dining room and a couple of beige/wheat colors.  A fairly neutral palate but lots of light coming into this house will make the colors change.


I also went with Rudy and Abel (our gardeners) to buy plants.   Christie and John, you will not be surprised that I haven't learned a damn thing about controlling myself at a nursery.  Hopefully, though, your wisdom filtered into my choices.  We bought several colors of New Zealand Flax (Phormium), Rock Rose (Cistus) in white and pink, Mexican Sage and a couple of other varieties of Sage, Lavendar, Rosemary, grasses, 3 Protea and a Leucadendron and Kangaroo Paws.  It's wonderful to learn I can grow a lot of the same things here as in Cambria, drought tolerant plants are a must (San Diego is on water rationing as far as outdoor watering is concerned).  We've already filled other garden spots with Kangaroo Paws, Flax, NZ Tea Trees, asparagus fern and Gardenia's (something I couldn't grow in Cambria and not terribly drought tolerant - an occasional excess isn't too bad :-).  After all this goes into the ground we will still have much to do but beginning is exciting and spirit lifting.  Having said that, we meet (tomorrow) with the tree guy and a friend of his who does landscape design.  The backyard is much more challenging than the front (though not as large) and mostly granite.  I'm wanting to plant all the succulents I brought, Agave's, Citrus trees and other kinds of trees.  I need expert advice.  Hopefully we'll get a plan going tomorrow and Pete (the tree guy) will commit to a date to plant trees.  By the way, the nemesis of the gardener in this area.....bunnies!  Lot's o rabbits everywhere!  I wanted to plant lettuce in the herb garden but I fear we'd never see a leaf.



Today at the house all the dry wall was delivered, they'll begin work tomorrow.  The electrical and plumbing inspection was taking place when I left, hopefully it is a go.  Insulation will go in tomorrow and that inspection will take place on Wednesday.  The pocket doors (3) were installed today so they can be dry walled at the same time as everything else.  (We still haven't made a front door decision.) Dry walling will begin in the master bedroom so that we can move in on or about May 15.  When dry wall is complete in the m.b. the painter will do his thing and the floor will be laid in that room.  By then the rest of the house will be ready for paint, etc.  As we tried to narrow the time-line down (with our project manager last Thursday), it became clear we probably have an additional month before completion.  Lot's of it will be loose ends and final inspections but it will be mid-June before it is finished.  In the meantime, our goal to have Mother's birthday party at the house on May 30 is still in place.  All the floors may not be wood, some could still be concrete and all the countertops may not be finished or the painting.  I'm glad it is a family party!

We can't say enough good things about our project manager and all the sub's working on our home.  A wonderful group of quality professionals and for this we thank Marrokal.  We still have issues with them and no one seems anxious to find resolution.  Stan may have to handle it with the checkbook if no answers are forthcoming.



The Chinese chest be bought to replace the altar table we sold to the new owners of the Cambria house.


While looking for something I came across one of my favorite silly little books "Today I Will Nourish My Inner Martyr" "Affirmations for Cynics" by Ann Thornhill & Sarah Wells. Let me share.....

"On this day I will look at my past mistakes and project them onto the future."

Resources:
Great for finding the right plants for your area
I'm not using Frazee paint but they have wonderful colors that can be copied by any paint company (using Dunn Edwards, painter likes it's formula and it has low VOC's)

Friday, April 9, 2010

Productive Week

A busy week of spending money and amazing transformations.

This is a view looking through the kitchen into Stan's office/guest room. Note the floors :-).  Not only is the Sautillo tile gone but the concrete is as smooth as can be, ready for new flooring.






This view is from the living room looking at a new wall (kitchen & pantry on the other side).  To the right of the new wall is a half wall that will be bar height.  We ended up not changing the arched window at this time.  Instead we got a blackout shade that will roll up into a sofit in the ceiling and can be used when we want to darken the rooms for t.v. viewing.  If we stay here long enough we'll replace the window but it just didn't seem important compared to other things and it needs to be a large window for the view.


Another view from the living room looking at the entry, new dining room and down the hall to our bedroom.  The wall on the right will house a large bookcase/entertainment center and next to that wall, where the concrete is darker (it's drying), is a very teeny closet that will house all the audio/video stuff, the server, etc.  Stan's bailiwick.





Monday we bought a new couch and chair.  We ordered all our lighting:

    This is the flush mount light for the entry


and this is the dining room fixture, both by Hubbardton Forge.


Some things are coming in higher than we'd hope.  We picked out the doors a week or two ago - wrong, we're not getting Mahogany.  Instead we'll get Douglas Fir (like we had in Cambria which is fine, they just didn't think they could get them) and have the painter stain them.  On-line we found a front door we like very much, it was about $1700 pre-hung.  The entry-door through Marrokal's supplier (Mahogany with glass insets) came in at about $4500.  We're taking a trip to L.A. to see if the door we found is as nice in person and if necessary we'll rent a truck to bring it down.  If that doesn't work out we'll keep looking.  The finish on the walls (what we had in Cambria) is known as "skip trowel".  The plaster (or whatever you call it) is shot on the walls, then they go back over it with a trowel to smooth it out, but not evenly.  This leaves a finish that looks (and is) more interesting, has texture to it.  Originally the budget called for just shooting it on, which is a builder spec look and not our favorite.  So this is going to be $3500 more and includes our bedroom which didn't lose any walls so they have to redo the current ones.  Getting the picture?  The good news is the painter's bid is lower than we'd expected but includes only 2 wall colors and a ceiling color.  Oh dear, I'm gonna want more colors than two and each additional one costs another $200.  The painter's bid does include staining doors, prepping, putty, caulking baseboards and all that good stuff so it isn't too bad.  Perhaps I'll use fewer colors and live in the house for awhile before picking additional ones.

Today I met with the gardeners to plot the next section of garden tear out and planting.  Steve reminded me that I need to get things in the ground early so they'll survive hot weather.  Coming from up north that hadn't occurred to me.  Still no trees which means I can't get too deep into planting in the backyard.



This is a section we've already ripped out except for the Bird of Paradise (which will be moved) and the Palm trees (which won't).







They'll continue to rip out above the wall to the end of the house (but not the plants & trees closer to the street - yet) and what is growing at the base of the wall along the driveway.  We'll just keep doing this section by section until one day it will be done.  Challenging!  Creative!





Our project manager, Mark, says we're still ahead of schedule.  After the electrical walk through the "rough"electrical and HVAC (heating and air conditioning) began.  Next week will be inspections on both those things then insulation and the insulation inspection.  After that, starting on or around 4/15 the dry wall gets hung.  Also the cabinet maker did the CAD drawing this week which we'll review next Tuesday, they then start building the boxes which takes 3 wks.   At the house during that period they'll finish the dry wall and skip trowel, the doors and painting will start and the floor will be laid in our bedroom (at the very least) so we can get back in when all the dust is gone.  Time can't move fast enough at the moment.

Sunday, April 4, 2010

Still Ahead......

We've moved into Steve's house for this week while he and the kids are away for spring break.  Our poor underprivileged family is spending a week on a chartered boat in the British Virgin Islands.  Next week we'll move to a less expensive (than the one we've rented until now), cleaner house in Escondido until we can move back home.  Nomads!  We're nomads!

So this week I felt better and got back to work.  Completion of framing, basic in-ground plumbing and concrete patching took up the week at the house. We are still ahead of schedule.  Our electrical walk-through was postponed until tomorrow so that "everyone could be there" (whatever that means?).  Our designer, our project manager, the audio-visual guy, the electrician and us chickens will attend.  This is where I get to ask for more lights and beg to move some and receive their recommendations.  Stan is working with the A.V. guy to get the house prewired for "all our needs".  From my perspective, innocuous speakers are the only important need.  No more plant stands!

This last week I chose the tiles for the bathrooms.  Yes, I'd done it before but then we changed the configuration of the two baths and I have more flexibility.  I want the powder room to be a bit dramatic, the guest bath to be beachy for the mermaid collection.

So I chose a Limestone from Israel - Hebron White, a mosaic glass tile blend called Enchantment (iridescent purple/olive green/pale green) and the Caesarstone remnant in Mocha for the counter.  Depending on the final cost the idea is to put the Hebron in 16x16 tiles on the floor, cut those in half and use them in a staggered pattern as wainscoting on three walls and run a row of the mosaic on the back wall (as a backsplash) behind the cabinet and toilet.  The cabinet will float and will be stained "Wenge", almost black.




For the guest bath we're sticking with the beach rock on the floor and the shower pan, the Seagrass Limestone on the shower walls, the rest of the Mocha Caesarstone remnant as the counter and a row of a mosaic glass tile blend in Muse (clear iridescent, Fleet blue iridescent and a pale green glass) as the backsplash.  Love it all, no second thoughts.


Beside those monumental decisions we selected a door style.  All our doors are 8 ft. tall (just couldn't be your average size door!!!) hollow-core, white doors builders use in spec houses.  We picked Mahogany two panel doors and Mahogany for the pocket doors as well.  They stain them on site - the top panel being longer (a rectangle) than the bottom (a square).  We decided to use the same style door as our front door (french style) but plan to replace the wood panels with rain glass.  Simple yet distinctive (we hope).

The garage is so full we can't take anything else on.  Yet, the refrigerator arrived and we managed to squeeze it in.  Tomorrow the toilets, sinks, fixtures, etc. will have to find a space as well.  We're still trying to sell the Viking Professional 48" stove that came with the place.  We relisted it today for $1000 - a bargain for someone who cooks seriously and has room for a behemoth - at least we think it is a bargain because it easily has 10-15 years of good cooking left.  We sold the Sub Zero for $700 - also a bargain.  By mid May I'll be giving the thing away!

Some decisions haven't come easy so we've just tabled them.  Lights!!!!  God, there are a lot of lights out there!  We wanted something "different" in a dining room fixture, a beautiful Asian style called "Shanghai" with shades and gew-gaws, but not cheesy.  I thought it was $485 so showed it to Stan and he loved it too.  It was $4,895.00!!  We just had to leave and pretend I dreamt the whole thing.


WAC Lighting PLD-F4-454WT/BK / PLD-F4-454WT/BN /PLD-F4-454WT/WT - One Light Cylindrical Pendant with White GlassThis is our choice for pendant lighting over the island in the kitchen.  Simple brushed nickel finish with a white glass shade.  Cheap - so we ordered it.









And here's a picture of the Caesarstone in the laundry with the red washer & dryer, white cabinets and flooring as yet to be selected.








I don't know how far north of us you had to be living not to feel the 6.9 earthquake (centered south of Mexicali) about an hour ago.  Australia is probably a good place though I know it's not north :-}  We shook, we rattled and we rolled for quite a long time.  I thought about Haiti and building codes and how I hate building depts. and permits.   I thank the people far wiser than me for the rules and the ingenuity that has created designs and materials to withstand some of what Mother Nature dishes out.  The idea of being "up to code" is very appealing.

This being a blog about remodeling I won't give you my opinions on the Catholic Church or the Easter Bunny.  Stay tuned.......

Sunday, March 28, 2010

Ahead of Schedule

Last week was very productive for the building team.  Stan say's, according to our Gantt chart, we are a week ahead of schedule.  This Thursday we have the electrical walk-through where we get to talk with the experts (electrician, a.v. person) about wiring, lighting and switch locations.  Perhaps all the drywall will be up by mid April.  We meet with the architect and project manager on Tuesday to get a better idea of the time line.

I spent most of the week in bed with the flu so my achievements aren't worth mentioning.  I made no decisions and researched very little.  Today was my first day at the house since last Monday. I walked into the house and remembered I don't like the framed part, didn't like it last time either.  Everything looks small and sort of like a puzzle and dark!  Huge holes in the floor where plumbing needs to go.

It is an amazing spring day in San Diego, clear as a bell, wildflowers a bloomin, everyone outside. Since I accomplished nothing, wasn't even around, I'll let the photo's do the talkin.  (Do you know if you double click on the pics they enlarge - I didn't realize that....neat :-)  More later this week.....

Backyard hill full of Acacia and rat's nests (YUK!)


Stripped bare (well almost), awaiting nice trees, succulents, cactus, natives, etc.









Dumpster - this is the third or 4th replacement for a full one.  We've lost track.








View of the new wall separating Stan's office/guest room from the kitchen/my work space.







The laundry room - picture red washer & dryer :), white/grey counter and floor tile to be determined this week.  Going to be a happy little place......












Framing, framing...... holes in the concrete for plumbing.  Looking at the guest and powder room, beyond that the dining room and entry.

Monday, March 22, 2010

Hell Week

So where was I.....

Moving again was just hell. We weren't ready to do it a second time in one month. I'm promised we'll hire movers to take us back into the house, we had no business doing this alone (even with Steve's help moving the furniture). I'm an exhausted, blithering idiot and although he might argue the point, Stan is no better. Our large 3 car garage is packed to the rafters with boxes and furniture. In the driveway lives a porta-potty, a huge dumpster and a load of lumber.

On Wednesday demo began, by Friday night all the walls, cabinets, plumbing, drywall and some of the floor were gone. How they worked so quickly is beyond my comprehension (most of them without masks!). Monday and Tuesday floor removal will continue and framing will begin.  (Pics shows a view of the "family room" fireplace area before and after plus a view of the "breakfast nook" soon to be my work space)



Fast tracking the decisions has also been exhausting and frustrating. We seem to be all over the County of San Diego looking at floors, plumbing fixtures, doors, granite, Caesarstone, etc. ( I sent you a link to our granite choice in the last post but I understand it didn't work - perhaps because it was misspelled. I'll try to improve my skills with this blog thing.) Caesarstone is a product made up of 95% granite, the rest resin - some of it with recycled glass. It is less expensive than granite, more contemporary looking (to my mind) and has all the qualities of granite - durable, hard, easy to clean. We're using this material in several locations. In the kitchen all the counters, except for the island (the Jurrasic Green granite) will be Caesarstone, color "Buttermilk". It will require 2 slabs with nothing leftover. Since my office/work space is adjacent to the kitchen, the counter will be of the same material. In the laundry room it will be "White Ash" (white with flecks of gray glass), a remnant that will look great with the red washer and dryer. The guest bath and powder will be remnants of "Mocha". We've also selected glass tiles for the backsplash in the kitchen, glass mosaic tile for the bath backsplashes and a polished limestone tile called "Seagrass" for the floors and shower surround. Selecting a wood floor was the final bit of insanity for last week. Too many choices and after standing in the showroom for two hrs. in Santee (out in the middle of frickin nowhere!!!!), I would have picked just about anything to get it over with. We brought samples home (a more relaxing place to make choices) over the weekend and were able to make a decision - Brazilian Tiger Mahogany. Reddish, lots of grain, I hope it works cause we're both over it!

Sorting out our issues with Marrokal, our contractors, is difficult and anxiety producing. Basically we're used to having a line-item budget and regular meetings with our contractors to know where we are visa-vie the budget. When we nixed some of their great plans for this house and said we'll spend X amount, what exactly did they cut to get us to that number? One cost reduction (without our prior knowledge) was fixtures - turns out we were supposed to pick toilets, sinks and fixtures for two baths and kitchen for $2000!!!! HELLO OUT THERE- what were they thinking??? There was no discussion regarding our choices or likes and dislikes. At the outset we made it clear this house is to reflect champagne taste on a beer budget ..... it can be done. Marrokal is more interested in the champagne budget because, duh, they get more money. I get that but I don't get creating a budget and not sharing every item with the homeowner. Annoying. Obviously we didn't ask all the right questions and make our desires known - a problem created by hurrying the process and minimal brain cell activity on the part of the homeowners!

I started this blog entry Saturday evening and here we are on Monday morning. Things look brighter today. It helped that we did nothing yesterday, absolutely nothing. We'll take a field trip to L.A. this week to look at doors, maybe rent a truck to bring them down here unless we find something equally as good at the right price. We have to return our samples to the floor store in, OMG, Santee and sign off on the final plan revisions. Need to select knobs and drawer pulls and make some decisions about window coverings and/or replacing some of the windows. Might get in some garden design and implementation - that would make me happy. And Stan needs to golf this week!

Maybe if we were younger the fast pace would have been easier. I liked having time to researcher everything well in advance of choices, not a luxury we have now. Having said that, we can't wait for all to be over. Stay tuned...........






Bless that man I love - he just had to bring his Ikea chair to the rental house and I'd already left in the Volvo.

Thursday, March 11, 2010

Decisions, decisions.....

We're having drinks and watching Charlie Rose (taped, with Nancy Pelosi), another drink is certain!

Yesterday and today were full of decisions. Since we're on the fast track with this remodel, we're also fast tracking the decision making process. In the last two days we've finalized the cabinets, counter tops, back splash as well as the bathroom cabinets, plumbing, tile etc. and placed the order for appliances. There have been communication break-downs with Marrokal (our remodeling company), naturally we think it is their issue. We also had our meeting to "pass the baton" - their description for the transition between design and actual remodeling. Our "Project Manager" is Mark, low-key and organized and very nice. He presented us with a Gantt chart showing the schedule/time line of tasks, completion date is 6/10/10 but we are assured (their term) that the house will be usable by Memorial Day weekend. This is a whole different ball game from building in Cambria!! Gantt chart - I don't think so.

I would always prefer to make decisions quickly. It is less stressful for me to decide then let it go. I'll always see something else (if I look) that I'll like better but if you wait around for that perfect thing you get stuck in the mud. I'm surprised that Stan is comfortable working this way. He's happy to leave some decisions to me and I'm quite happy to let him go over every frickin' word of contracts and argue, with Marrokal, the meaning of "supply" in one sentence. Was he this way at work? This is not a side of his personality I've experienced before. I think he's really enjoying his involvement with this project where as when he worked there was no space in his mind for such things.

Today after two meetings we went to Old Town and had Margarita's and lunch at Casa Guadalajara. Great place. As long as we can find time to do something else and not take the stress out on one another we'll be good.

Photo's to come soon. Here are some websites to check out some of our decisions:

Refrigerator - Leibherr - German, bought floor model (big splurge - will go into our trust :o)
Liebherr Refrigerator
Jurassic Green Granite - pic probably won't do this justice but think prehistoric, think making a statement

Tuesday, March 9, 2010

We Begin....

I'll start by saying that we know we're crazy!!

February 2, 2010 we moved from Cambria to San Diego. We bought our new home knowing we wanted to remodel the kitchen and clean up the yard a bit. We love the "bones" of this house, the great view and it's location near Steve, RJ and Jenna.

Since we are strangers to the area we chose to hire a "remodeling firm" that does everything - design, interior design support, construction, etc. No doubt this is a more expensive way to go but will allow us to accomplish our goals quickly. So far we have interacted with the architect and, as Stan puts it, the chief salesman. Their job is to listen to our needs, then suck us in to adding more to the project. I'd say they are very good at what they do! The architect, Michael, has been great. He loves what he does, listens well and respects our "ownership" of this project. A very different experience from the one we had in Cambria.

Tomorrow the team increases to include the "project manager" who will join a walk through of the house in advance the actual start. There are others on this extended team but we don't yet know who they are (stay tuned...). Monday they begin "staging" which lasts for two days. We've been told our project will be completed, or close to completed, by Memorial Day weekend when we plan to celebrate mother's 95th birthday.

The extent of this remodel now includes knocking down every interior wall save one. It encompasses the kitchen, moving the dining room, moving the laundry room, moving the powder room, redoing the guest bath and replacing ALL the flooring. We move out on Monday. Demolition begins on Wednesday next week after staging. Our understanding is it will take two days to accomplish the tear down. Incredulous!

For the record I've gone from being calm, cool and collected to having a major breakdown. Today it was so bad that I went on-line (supposedly) to see if our buyers in Cambria had sold their house. Before I knew it I was looking at pictures of our former house, longing for unpacked boxes and organized spaces. This will pass, but not for awhile.